Fill Out a Valid Peco Service And Meter Application Form
The Peco Service and Meter Application form is a crucial document for anyone seeking electric service from PECO, one of the leading utility companies in the region. This application is designed to ensure that all necessary information is collected to facilitate a smooth service connection. The form includes sections for personal identification, service location details, and specific requests regarding the type of service needed—be it new service, load increases, or temporary service. It also requires the inclusion of important identifiers such as the customer’s driver's license number or social security number, as well as the electrician or contractor's tax identification number. Additionally, applicants must provide details about the construction status and the characteristics of the electrical load, including connected kilowatts and maximum demand for both summer and winter. It's essential to complete all fields accurately, as any incomplete information can lead to delays in processing. The application must be signed and dated before submission to the appropriate PECO regional office, and applicants should be aware that the company reserves the right to cancel requests if there is no further communication within 90 days. Understanding these requirements is vital for ensuring a timely and efficient service connection.
Common mistakes
-
Neglecting to read the instructions: Many applicants jump straight to filling out the form without thoroughly reviewing the instructions. This can lead to mistakes that delay the process.
-
Incorrect regional office selection: It's essential to identify and check the correct PECO regional office. Failing to do so can result in the application being sent to the wrong location.
-
Omitting required identification numbers: Forgetting to include the customer's Driver's License Number or Social Security Number can cause the application to be incomplete.
-
Inaccurate service location: Providing an incorrect address for the service location can lead to significant delays. Always double-check the address for accuracy.
-
Failure to specify construction status: Not indicating the current construction status can create confusion. Be clear about whether the work has started, is in progress, or is completed.
-
Missing load characteristics: When filling out the load characteristics table, it's important to provide all requested information, such as Connected KW and Maximum Demand. Incomplete data can hinder processing.
-
Not signing and dating the application: An unsigned or undated application is not valid. Ensure that both the signature and date are included before submission.
-
Ignoring additional comments: If there are specific details or comments that could help clarify the application, include them. Skipping this step may lead to misunderstandings.
-
Overlooking the need for a site plan: Some types of service requests require a site plan. Failing to include this can result in delays or rejection of the application.
Preview - Peco Service And Meter Application Form
INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER
Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM
A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.
B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.
Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.
(**) Use the address of the service when applying for underwriter's inspection.
C.Complete the fields for customer's PECO billing address or account number (within last 60 days).
D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.
E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".
F. thru J. Indicate the following:
•Type of Request
•Type of Service (include number of units and area per unit)
•Service Characteristics
•Meter Information
•Heating/Air Conditioning
K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.
L.Complete the table concerning motor information.
M.If compensated metering will be used, indicate totalizer and general load (KW).
N.Include any additional comments.
O. |
Application MUST be signed and dated. |
Forms Rev. 5/18 |
PECO
Application for Electric Service & Meter
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL
NEW BUSINESS SERVICES
PHILADELPHIA |
|
|
|
DELAWARE & CHESTER COUNTIES |
BUCKS & MONTGOMERY |
|
|
|
|
|
|
|
NEW RESIDENTIAL |
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||||
COUNTY |
|
|
|
1050 W. Swedesford Rd. |
COUNTIES |
|
|
|
|
|
|
|
|
|
CONSTRUCTION |
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
A |
|
|
|
||||||||||||||||||||||||||||||||||||||||
830 S. Schuylkill Ave. |
Berwyn, PA 19312 |
|
|
|
|
400 Park Ave. |
|
|
|
|
|
|
|
|
|
(All Counties) |
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
Philadelphia, PA 19146 |
Email:DelChesterServiceApplications@ex |
Warminster, PA 18974 |
|
|
|
|
|
|
|
|
|
400 Park Ave. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
Email:PhilaNewBusiness@e |
eloncorp.com |
|
|
|
|
|
|
|
Email:Bucksmontserviceapplications@e |
Warminster, PA |
18974 |
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||
xeloncorp.com |
|
|
|
Fax # (610) |
|
|
|
|
xeloncorp.com |
|
|
|
|
|
|
|
|
|
Email:NRCGMETERORDERS@P |
|||||||||||||||||||||||||||||||||||||
Fax # (215) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER NAME |
|
|
|
|
|
|
|
|
|
|
|
|
Tax ID # or SSN |
|
|
TYPE OF REQUEST |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New Service |
|
|
Load Increase/Decrease |
|
Reintroduction of Service |
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Temporary Service |
Upgrade/Changes |
|
Demolition (Remove |
|
|
|
||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Separation of Wiring |
Service Relocation |
|
|
|
Service) |
|
|
|
|
|
|
|||||||||||||||||||||||
** ADDRESS TO BE SERVED |
|
|
B |
|
|
|
|
|
APARTMENT/LOT # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
F |
|
|
|
|
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
energize/Cover) |
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CITY, STATE |
|
|
|
|
|
|
|
|
|
|
|
|
ZIP CODE |
|
|
|
|
|
|
TYPE OF SERVICE: Please include site plan. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RESIDENTIAL |
|
|
|
|
|
|
|
|
|
|
|
|
COMMERICAL |
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Single House |
Mobile Home |
Store |
|
|
|
|
Office |
|
|
|
G |
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Apartment |
Modular Home |
Industrial |
|
|
|
|
Warehouse |
|
|
|
||||||||||||||||||||||||
UTILITY POLE# |
SUBDIVISION/DEVELOPMENT |
|
|
TOWNSHIP/MUNICIPALITY/WARD# |
|
Duplex |
Town House |
Restaurant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other _____________________________ |
Other _____________________________ |
|||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Area of Building _______________________ Sq. Ft. |
|
|
|
|
|
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* If Applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SERVICE CHARACTERISTICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
** Please use this address when applying for underwriter’s inspection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
|
|
WIRES |
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Underground |
|
|
Aerial |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
CUSTOMERS BILLING ADDRESS |
|
C |
|
|
|
|
PECO ENERGY ACCOUNT# |
|
|
|
|
|
|
|
|
|
|
3 |
|
|
240 |
|
|
|
3 |
|
|
|
|
|||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AMPS _________ |
|
|
|
|
|
3 |
|
|
120/240 |
|
|
|
4 |
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
WIRES |
|
|
|
|
|
|
|
3 |
|
|
120/208 |
|
|
|
4 |
|
|
|
|
|||||||||
CITY, STATE |
|
|
ZIP CODE |
|
|
|
|
|
TELE. # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120 |
|
|
2 |
|
|
|
|
|
|
|
|
3 |
|
|
277/480 |
|
|
|
4 |
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120/240 |
|
3 |
|
|
|
|
|
|
|
|
3 |
|
|
13200 |
|
|
|
3 or 4 |
||||||||||||
SEND REPLY TO: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
120/240 |
|
5 |
|
|
|
|
|
|
|
|
3 |
|
|
33000 |
|
|
|
3 or 4 |
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
ELECTRICIAN’S OR BUILDER’S NAME |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
METER INFO: |
Two Meters, Commercial (General/Totalizer) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I |
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Single Meter Required |
|
|
|
|
|
|
|
Multiple Meter Total No. _____________ |
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ADDRESS |
|
|
|
|
|
|
|
|
|
|
Reply Requested by: |
|
|
HEATING/AIR CONDITIONING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
D |
|
|
|
|
|
|
/ |
/ |
|
|
|
Central Air _____ Tons |
|
Resistance |
|
|
|
J |
|
Heat Pump _____ Tons |
|
|
|
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
Natural Gas |
|
|
|
Propane |
|
|
|
|
|
Type |
|||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other ________________ |
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
City, State |
|
|
|
|
|
|
|
|
|
|
ZIP CODE |
|
|
|
|
|
|
CHARACTERISTICS OF NEW OR ADDITIONAL LOAD: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONNECTED |
|
PECO ENERGY USE ONLY (DEMAND) |
|
||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TYPE |
|
LOAD (kW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
TELE. # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUMMER (kW) |
|
|
|
Winter (kW) |
|
|||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIGHTING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
K |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
CURRENT CONSUTRCTION STATUS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HEATING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
Not Started – Date Customer Will Start Work: _____/_____/_____ |
In Progress Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
AIR/COND. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
Approximate Date Service Requested: _____/_____/_____ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
E |
|
|
|
TANKLESS WATER HTR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MISC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER COMMENTS/ DESCRIPTIN OF WORK |
|
|
N |
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Include single line diagram and substation arrangement if appropriate. |
||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LARGEST MOTOR SPECIFICATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
O |
|
|
|
|
|
|
|
|
|
|
QUANTITY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTALIZER LOAD |
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SIZE (HP) |
|
|
|
|
|
|
|
|
|
|
L |
|
|
|
|
|
|
|
|
M |
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LOCKED ROTOR CURRENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KW |
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MOTOR CODE LETTER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
SUBMITTED BY: _________________________________ DATE: ______________________ |
|
PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERAL LOAD |
|
|
|
||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||
|
VOLTAGE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
PECO
Application for Electric Service & Meter
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
PURPOSE
KW
INFORMATION BELOW WILL BE FILLED IN BY PECO: |
|
|
|
|
|
|
|
|
|
|
|
Service Request No. |
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
BUS/MAJ ACCT REP |
|
TELEPHONE |
DATA RECEIVED |
DESIGNER |
|
|
|
|
|
DATA RECEIVED |
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TELEPHONE |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
POL SUB |
|
RATE |
|
RIDER |
|
CONTRACT LIMITS |
|
SIC NUMBER |
|
T |
|
DATE REPLY |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NUMBER |
|
COMPLETED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
AMPS |
|
WIRES |
|
VOLTAGE |
PHASE |
|
|
CIRCUIT |
|
|
|
|
|
|
LOAD (KVA) |
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUMMER_____WINTER ____ |
|
SERVICE CHARACTERISITICS – Select One from Each |
|
|
|
|
|
|
|
|
|
POLE # / MH # LOCATION |
|
CUT THROUGH DATE |
|||||||||||
SERVICE TYPE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Aerial |
|
|
|
Underground |
URD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
RATE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Residential |
|
|
Comm (Non- |
|
Comm (Demand) |
|
HT/PD |
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
Demand) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERATION PROCUREMENT CLASS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
Class 1 (Residential) |
|
|
|
Class 2 (Commercial, less than 100kW) |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
Class 3 (Commercial, 100kW to 500kW) |
|
Class 4 (Commercial, greater than 500kW) |
|
|
|
|
|
|
|
|
|
|
|||||||||||
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load |
|
|
|
|
|
|
|||||||||||||||||
estimates for the first year of service. The customer’s Procurement Class will be adjusted each year, |
|
|
|
|
|
|
|||||||||||||||||
based on actual usage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
METER TYPE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KWH |
|
|
IND. DEMAND |
RECORDER |
TOU |
|
|
|
|
|
|
|
|
|
|
||||||||
SERVICE PHASING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
SINGLE PHASE |
TWO PHASE |
THREE PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
SERVICE REQUIREMENTS: |
|
|
|
|
|
|
METERING LOCATION AND REQUIREMENTS: |
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
Present Location: |
Meter # _______________ |
CTs- |
|
||||||||||
Present Service OK |
Loop Only |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
________ |
|
|
|||||
Taps Only |
|
|
See Job # ________________________________ |
|
Indoo |
Outdoor |
|
On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above |
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
r |
|
|
|
|
|
Ground |
|
|
|
||||
ADVANCE NOTIFICATIONS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER BILLING: |
|
|
|
||||||
Underwriter’s Cert. |
|
Yes |
No |
|
|
|
|
|
|
|
|
|
Advance Billing |
Yes |
|
$_______________ |
|||||||
Required |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required |
|
|
|
__ |
|||
Customer to Trench |
|
Yes |
No |
|
|
|
|
|
|
|
|
|
|
|
|
No Customer |
|
|
|||||
Permit Required |
|
Yes |
No |
State |
Other |
|
|
|
|
|
|
|
Charges: |
$_______________ |
|||||||||
|
|
|
|
|
|
|
|
|
|
|
__ |
||||||||||||
|
|
|
|
|
|
|
|
_______________________ |
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
Cust. # |
|
|
Date |
|
|
||||||||
ACT 222 Cert. Required |
|
Yes # |
|
|
No |
N/A |
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
_________________________ |
|
___________________________ |
||||||||||||
|
|
|
_____________ |
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
BTCO # |
|
|
Date |
|
|
||||||
PA One Call # |
|
|
|
|
|
|
|
Date |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
________________________ |
|
___________________________ |
||||||||
___________________________ |
|
|
|
|
__________________________ |
|
|
||||||||||||||||
|
|
|
|
|
CATV # |
|
|
Date |
|
|
|||||||||||||
Gas |
BTCO |
CATV |
Other |
|
Date |
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
________________________ |
|
___________________________ |
||||||||||||||
|
|
|
|
|
___________________ |
__________________________ |
|
|
|||||||||||||||
|
|
|
|
|
|
Other |
|
|
Date |
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
__________________________ |
|
___________________________ |
|||||
SKETCH / INSTRUCTIONS
PECO
Application for Electric Service & Meter
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL
NEW BUSINESS SERVICES
PHILADELPHIA COUNTY |
DELAWARE & CHESTER COUNTIES |
BUCKS & MONTGOMERY |
|
|
|
|
|
NEW RESIDENTIAL |
|
|
|
|||||||||||||||||||||||||
830 S. Schuylkill Ave. |
1050 W. Swedesford Rd. |
|
COUNTIES |
|
|
|
|
|
|
|
|
CONSTRUCTION |
|
|
|
|||||||||||||||||||||
Philadelphia, PA 19146 |
Berwyn, PA 19312 |
|
400 Park Ave. |
|
|
|
|
|
|
|
|
(All Counties) |
|
|
|
|
|
|
||||||||||||||||||
Email:PhilaNewBusiness@ex |
Email:DelChesterServiceApplications@exe |
Warminster, PA 18974 |
|
|
|
|
|
|
400 Park Ave. |
|
|
|
|
|
|
|||||||||||||||||||||
eloncorp.com |
|
|
loncorp.com |
|
|
|
Email:Bucksmontserviceapplications@e |
|
Warminster, PA 18974 |
|
|
|
||||||||||||||||||||||||
Fax # (215) |
Fax # (610) |
|
xeloncorp.com |
|
|
|
|
|
|
|
|
Email:NRCGMETERORDERS@P |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax # (215) |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER NAME |
|
|
|
|
Tax ID # or SSN |
|
|
|
TYPE OF REQUEST |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
New Service |
|
|
Load Increase/Decrease |
|
Reintroduction of Service |
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Temporary Service |
Upgrade/Changes |
|
Demolition (Remove |
|||||||||||||||||||||
** ADDRESS TO BE SERVED |
|
|
APARTMENT/LOT # |
|
|
|
Separation of Wiring |
Service Relocation |
|
|
Service) |
|
|
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
energize/Cover) |
|
|
|
||||
CITY, STATE |
|
|
|
|
ZIP CODE |
|
|
|
TYPE OF SERVICE: Please include site plan. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RESIDENTIAL |
|
|
|
|
|
|
|
|
|
COMMERICAL |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Single House |
Mobile Home |
Store |
|
|
|
|
Office |
|
|
|
||||||||||||||
UTILITY POLE# |
SUBDIVISION/DEVELOPMENT |
|
TOWNSHIP/MUNICIPALITY/WARD# |
|
Apartment |
Modular Home |
Industrial |
|
|
|
|
Warehouse |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Duplex |
Town House |
Restaurant |
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Other _____________________________ |
Other _____________________________ |
|||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Area of Building _______________________ Sq. Ft. |
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
* |
If Applicable |
|
|
|
|
|
|
|
|
|
SERVICE CHARACTERISTICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
** |
Please use this address when applying for underwriter’s inspection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
WIRES |
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Underground |
|
|
Aerial |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
CUSTOMERS BILLING ADDRESS |
|
|
PECO ENERGY ACCOUNT# |
|
|
|
|
|
|
|
|
|
|
3 |
|
|
240 |
|
3 |
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
AMPS _________ |
|
|
|
|
3 |
|
|
120/240 |
|
4 |
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
VOLTS |
|
WIRES |
|
|
|
|
|
3 |
|
|
120/208 |
|
4 |
|
|
|||||
CITY, STATE |
|
ZIP CODE |
|
TELE. # |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120 |
|
|
2 |
|
|
|
|
|
3 |
|
|
277/480 |
|
4 |
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
|
120/240 |
|
3 |
|
|
|
|
|
3 |
|
|
13200 |
|
3 or 4 |
|
||||||
SEND REPLY TO: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
|
120/240 |
|
5 |
|
|
|
|
|
3 |
|
|
33000 |
|
3 or 4 |
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
ELECTRICIAN’S OR BUILDER’S NAME |
|
|
|
|
|
|
|
METER INFO: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Two Meters, Commercial (General/Totalizer) |
|
|
|
|
|
|
||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Single Meter Required |
|
|
|
|
|
Multiple Meter Total No. _____________ |
||||||||||||||||||
ADDRESS |
|
|
|
|
Reply Requested by: |
|
|
|
HEATING/AIR CONDITIONING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
/ |
/ |
|
|
Central Air _____ Tons |
|
Resistance |
|
|
|
|
|
Heat Pump _____ Tons |
|||||||||||||||||
|
|
|
|
|
|
|
|
|
Natural Gas |
|
|
|
Propane |
|
|
|
|
|
|
Type |
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other ________________ |
|||||||
CITY, STATE |
|
|
|
|
ZIP CODE |
|
|
|
CHARACTERISTICS OF NEW OR ADDITIONAL LOAD: |
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONNECTED |
|
PECO ENERGY USE ONLY (DEMAND) |
|||||||||||||||||
TELE. # |
|
|
|
|
|
|
|
|
|
TYPE |
|
LOAD (kW) |
|
SUMMER (kW) |
|
Winter (kW) |
|
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
LIGHTING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
CURRENT CONSUTRCTION STATUS: |
|
|
|
|
|
|
|
HEATING |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
Not Started – Date Customer Will Start Work: _____/_____/_____ In Progress Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
AIR/COND. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
Approximate Date Service Requested: _____/_____/_____ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
TANKLESS WATER HTR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MISC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
CUSTOMER COMMENTS/ DESCIPTION OF WORK: |
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Include single line diagram and substation arrangement if appropriate. |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
LARGEST MOTOR SPECIFICATIONS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
QUANTITY |
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTALIZER LOAD |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
SIZE (HP) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
LOCKED ROTOR CURRENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KW |
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
MOTOR CODE LETTER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
SUBMITTED BY: _________________________________ DATE: ______________________ |
|
|
PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
GENERAL LOAD |
|||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
VOLTAGE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
PECO
Application for Electric Service & Meter
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
PURPOSE
KW
INFORMATION BELOW WILL BE FILLED IN BY PECO: |
|
|
|
|
|
|
|
|
|
|
|
Service Request No. |
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
BUS/MAJ ACCT REP |
|
TELEPHONE |
|
DATA RECEIVED |
DESIGNER |
|
|
|
|
|
|
DATA RECEIVED |
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TELEPHONE |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
POL SUB |
|
RATE |
|
RIDER |
|
CONTRACT LIMITS |
|
SIC NUMBER |
|
|
T NUMBER |
|
DATE REPLY |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COMPLETED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
AMPS |
|
WIRES |
|
VOLTAGE |
PHASE |
|
CIRCUIT |
|
|
|
|
|
|
LOAD (KVA) |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUMMER_____WINTER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
____ |
|
SERVICE CHARACTERISITICS – Select One from Each |
|
|
|
|
|
|
|
|
|
POLE # / MH # LOCATION |
|
|
CUT THROUGH DATE |
|||||||||||
SERVICE TYPE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Aerial |
|
|
|
Underground |
|
URD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
RATE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Residential |
|
|
Comm |
Comm (Demand) |
|
HT/PD |
|
|
|
|
|
|
|
|
|
|
|
|
||||||
GENERATION PROCUREMENT CLASS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
Class 1 (Residential) |
|
|
|
Class 2 (Commercial, less than 100kW) |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
Class 3 (Commercial, 100kW to 500kW) |
|
Class 4 (Commercial, greater than 500kW) |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for |
|
|
|
|
|
|
|
|
|
|
||||||||||||||
the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage. |
|
|
|
|
|
|
|
|
|
|
||||||||||||||
METER TYPE: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KWH |
|
|
IND. DEMAND |
|
RECORDER |
TOU |
|
|
|
|
|
|
|
|
|
|
|
|
||||||
SERVICE PHASING: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
SINGLE PHASE |
TWO PHASE |
|
THREE PHASE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
SERVICE REQUIREMENTS: |
|
|
|
|
|
|
METERING LOCATION AND REQUIREMENTS: |
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
Present Location: |
Meter # _______________ |
|
CTs- ________ |
|
||||||||||
Present Service OK |
Loop Only |
|
|
|
|
|
Indoor Outdoor |
On ________ |
Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground |
|||||||||||||||
Taps Only |
|
|
See Job # _________________________________ |
|
||||||||||||||||||||
ADVANCE NOTIFICATIONS: |
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER BILLING: |
|
|
|
|
|
|
|
|||||
Underwriter’s Cert. Required |
|
Yes |
No |
|
|
|
|
|
|
|
Advance Billing Required Yes |
|
|
$_________________ |
||||||||||
Customer to Trench |
|
Yes |
No |
|
|
|
|
|
|
|
|
|
|
|
|
No Customer Charges: $_________________ |
||||||||
Permit Required |
|
|
|
Yes |
No |
State |
Other _______________________ |
Cust. # _________________________ |
Date ___________________________ |
|||||||||||||||
ACT 222 Cert. Required |
|
Yes # _____________ |
No |
N/A |
|
|
|
|
BTCO # ________________________ |
Date ___________________________ |
||||||||||||||
PA One Call # ___________________________ |
|
|
Date __________________________ |
CATV # ________________________ |
Date ___________________________ |
|||||||||||||||||||
Gas |
BTCO |
CATV |
Other ___________________ |
Date __________________________ |
Other __________________________ |
Date ___________________________ |
||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SKETCH / INSTRUCTIONS
Other PDF Templates
Geico Supplement Request Portal - Indicate the vehicle year to help identify the specific model of the car.
When engaging in the purchase or sale of a recreational vehicle in Texas, it is crucial to utilize the RV Bill of Sale form to ensure a smooth transaction. This legal document confirms the change of ownership and provides necessary details about the exchange. Additionally, for more information on the specific requirements and to access the form, you can visit https://autobillofsaleform.com/rv-bill-of-sale-form/texas-rv-bill-of-sale-form/, which serves as a valuable resource for both sellers and buyers.
Artist Agreement - The artist is engaged as an independent contractor to create tattoos.
Cuddle Buddy Application Meme - Find someone who values affection and companionship.
Documents used along the form
When applying for electric service through the Peco Service and Meter Application form, several other documents may be required to ensure a smooth process. Below is a list of these forms and a brief description of each. Understanding these documents can help facilitate your application and avoid potential delays.
- Site Plans: This document provides a detailed layout of the property where the service will be installed. It helps the utility company understand the placement of structures and the location of existing utilities.
- Single Line Diagram: A single line diagram illustrates the electrical system's layout, including all components and their connections. This is essential for understanding the electrical load and service requirements.
- WC-1 Georgia Form: This form is essential for employers to report workplace injuries timely, and more details can be found at https://georgiapdf.com.
- Substation Arrangement: This document outlines the arrangement of electrical equipment at a substation. It is crucial for larger projects where power distribution and management need to be clearly defined.
- Credit Application and Agreement: If you are a new customer or have not had service in the last 60 days, you may need to complete a credit application. This helps establish your creditworthiness with the utility provider.
- Underwriter's Certification: This certification confirms that the electrical installation complies with local codes and standards. It is often required before service can be activated.
- Demolition Request Form: If you are demolishing a building and need to remove existing electric or gas facilities, this form must be submitted to ensure safe disconnection of services.
Gathering these documents in advance can significantly streamline your application process. It is always advisable to review the requirements carefully and reach out to the utility provider for any clarifications. Doing so will help ensure that your request is processed efficiently and without unnecessary delays.
Similar forms
The PECO Service and Meter Application form shares similarities with the Electric Service Application, commonly used by utility companies. Both documents require customers to provide personal information, including identification numbers and service addresses. They also ask for details about the type of service requested, such as new service or upgrades. This ensures that the utility can accurately assess the needs of the customer and allocate resources accordingly. Timely and complete submission of these forms is crucial to avoid delays in service initiation.
Another document akin to the PECO form is the Gas Service Application. Like the electric service form, it requests essential customer information, including location and identification. It also includes sections for the type of gas service required, whether residential or commercial. Both applications emphasize the importance of compliance with safety regulations and local codes, ensuring that service installations are safe and effective.
The Washington Mobile Home Bill of Sale form is an important legal document that facilitates the transfer of ownership of mobile homes, not unlike the various applications and agreements described in our discussions. Just as each form requires meticulous details to ensure clarity and compliance with regulations, the Mobile Home Bill of Sale ensures a smooth transaction by detailing the buyer's and seller's information, mobile home description, and sale price, protecting the interests of both parties involved in the process.
The Water Service Application is also similar in structure and purpose. It collects customer details and service location, much like the PECO form. Additionally, it requires information on the type of water service needed, whether for residential or commercial use. Both documents aim to streamline the application process and ensure that all necessary information is gathered upfront to facilitate timely service provision.
The Construction Service Application shares commonalities as well. This form is often used for new construction projects and requires detailed information about the construction site, including project timelines and service needs. Both applications prioritize clear communication of requirements to help utility companies manage their resources effectively and ensure that services are established without unnecessary delays.
Similarly, the Temporary Service Application serves a specific purpose but follows a comparable format. It asks for customer identification, service location, and the nature of the temporary service required. This document, like the PECO application, emphasizes the importance of providing accurate information to ensure that temporary services are set up efficiently and in compliance with regulations.
Finally, the Demolition Service Application is another document that reflects similarities with the PECO Service and Meter Application. It requires identification and location details while focusing on the need for utility disconnections prior to demolition. Both forms underscore the necessity of clear communication and compliance with safety standards to prevent issues during the service discontinuation process.
Dos and Don'ts
When filling out the PECO Service and Meter Application form, it’s important to follow certain guidelines to ensure a smooth process. Here’s a list of things you should and shouldn't do:
- Do: Read the instructions carefully before starting the application.
- Do: Provide accurate customer information, including name, service location, and identification numbers.
- Do: Specify the type of service requested clearly, including any necessary details about the load characteristics.
- Do: Indicate the current construction status and avoid vague terms like "as soon as possible."
- Do: Ensure that the application is signed and dated before submission.
- Do: Include any additional comments or specific requirements that may help in processing your request.
- Don't: Forget to check the appropriate regional office for submission.
- Don't: Leave any fields blank; incomplete information can delay processing.
- Don't: Use outdated or incorrect identification numbers, as this may lead to rejection.
- Don't: Neglect to provide a site plan if required for your type of service.
- Don't: Submit the application without confirming that all information is accurate and up-to-date.
- Don't: Delay communication with PECO if additional information is requested; this could result in cancellation of your request.
Key takeaways
Before filling out the Peco Service and Meter Application form, carefully read the provided instructions. This ensures you understand the requirements and can complete the application accurately.
Include your Driver's License Number or Social Security Number in the application. This information is now mandatory for all applicants.
Be specific about your type of service request. Clearly indicate whether you are applying for new service, a load increase, or other options to avoid delays in processing.
Complete all relevant fields regarding the electrician or contractor involved. This includes providing their Tax Identification Number and the date you would like a response.
Remember to sign and date the application. An unsigned application will be considered incomplete and may lead to processing delays.
How to Use Peco Service And Meter Application
Completing the Peco Service and Meter Application form is essential for initiating your electric service. Ensure you have all necessary information on hand to avoid delays. Follow these steps carefully to fill out the form accurately.
- Read the instructions at the top of the application.
- Locate the appropriate PECO regional office for your service request and check the corresponding box.
- Fill in your name and the service location. Include your Driver's License Number or Social Security Number as required.
- If applicable, include the PECO Energy pole number and/or lot number.
- Provide your PECO billing address or account number from the last 60 days.
- Complete the electrician or contractor's information, including their Tax Identification number and the desired date for a response.
- Indicate the current construction status and the date you are requesting PECO service.
- Specify the type of request, type of service, service characteristics, meter information, and heating/air conditioning details.
- Fill out the load characteristics table, providing connected KW, maximum summer KW demand, and maximum winter KW demand for each applicable load type.
- Complete the motor information table if applicable.
- If compensated metering is used, indicate the totalizer and general load in KW.
- Include any additional comments that may be relevant.